105 Lost Beach

105 Lost Beach Lane

Ponte Vedra Beach, FL 32082

 

Watch this video for details on the PREFER model.


PREFER Loan Amount

Total Raise: $1,000,000

  • Down Payment: $577,500

  • 2.5% Points: $46,800

  • Closing Costs: $93,625

  • Construction Fee & Costs: $25,000

  • Wholesale Fee: $80,000

  • Carrying Cost (6-8 Months): $270,000

PREFER Secured Loan Interest: $270,000

Cash on Cash Return: 27%

BECOME A LENDER ON A SIMILAR DEAL

Property Details

  • 5 Beds, 5* Baths, 4,100 Sq. Ft.

    • *after adding bath

  • Two-Story with Pool + Spa

  • Steps to the Atlantic Ocean

  • Located in Private Neighborhood

  • Near Ponte Vedra Inn & Beach Club

Rehab Details

  • New Fully Remodeled Kitchen w/ Luxury Appliances

  • All Bathrooms Remodeled

  • Adding 1 Bath

  • Interior/Exterior Paint

  • New Flooring, Windows, and Sliders

  • Remove Pool Cage

  • Landscaping

Property Data

Buy Price: $1,650,000

  • Mortgage Amount: $1,872,500

  • Rehab Cost: $1,000,000

  • Estimated Completion: 6-8 Months

Estimated After Repair Value: $4,000,000

Estimated to Market: Summer 2026

Estimated Payout: Fall 2026

The PREFER Model

  • High-End Luxury Fix & Flips

    • Operating only in coastal markets

    • Choosing properties that are not selling for their full value because they’re out of date and missing the key features & amenities luxury buyers are looking for.

  • Totally Passive

  • Short-Term Cash on Cash Returns

    • 6-8 Month Rehab Timeline

    • Returns Expected Within 12 Months

  • Fractional

    • $50,000 Minimum

  • Geographic Mobility

    • Lender doesn’t have to be local to the property.

  • Extensive Due Diligence

    • Several third-party appraisals and consultations with local real estate agents and professionals to ensure these deals will produce the expected returns.

Property Updates

07.24.26 Update

  • New fascia and aluminum trim complete

  • New stairs and railings complete

  • Stairs have been stained

  • Pool scheduled

  • Glass for showers Complete

  • Exterior stucco complete

  • Counters Installed

  • Interior vanities ordered

  • Floor Complete

  • Landscaping set to begin

  • Appliances Installed

  • Final Painting

  • Plumbers installing fixtures

11.01.25 Update

  • New kitchen design completed and framed

  • All plumbing fixtures ordered

  • Scaffolding in place removing crown moulding and modernizing ceiling

11.15.25 Update

  • Custom cabinets underway

  • New kitchen design framed

  • Windows and sliders en route

11.08.25 Update

  • Exterior facade demo complete

  • Scaffolding in place removing crown moulding and modernizing ceiling

10.04.25 Update

  • New upstairs bathroom framed and prepped for plumbing

  • Electrical and HVAC underway

  • Closet design underway

10.24.25 Update

  • Scaffolding in place

  • Removing crown moulding

  • Modernizing ceiling

10.17.25 Update

  • New kitchen design complete and framed

  • Electrical and HVAC complete

  • Appliance package ordered

09.05.25 Update

  • Final architectural plans completed

  • Permit secured

  • Materials are being ordered

  • Windows & doors en route

09.26.25 Update

  • Additional demo completed for window installation

  • Electrical underway

09.19.25 Update

  • Windows and doors delivered

  • Electrical underway

08.23.25 Update

  • Framing underway

  • Fireplace removed

  • Old insulation removed

  • Electrical underway

08.01.25 Update

  • Demo done

  • Design book complete

  • Construction starting

08.29.25 Update

  • Builder finalized plans with design team Friday morning

  • Permit secured

  • Materials are being ordered

  • Windows & doors en route

06.20.25 Update

  • Finalizing design book.

07.18.25 Update

  • Design book is complete!

07.07.25 Update

  • Architectural and engineering plans approved.

  • Framing starting.

05.30.25 Update

  • Demo is complete

  • Architectural plans in process

06.13.25 Update

  • Finalizing design plans.

06.06.25 Update

  • Demo is complete.

  • Architectural plans in place for taller/wider doorways.

  • Plumbing and electrical are next.

05.23.25 Update

  • Demo almost complete

  • Plans in process

05.09.25 Update

  • Demo has begun

  • Windows have been ordered

05.16.25 Update

  • Demo is well under way

07.11.26 Update

  • New fascia and aluminum trim complete

  • New stairs and railings complete

  • Pool scheduled

  • Glass for showers Complete

  • Exterior stucco complete

  • Counters Installed

  • Interior vanities ordered

  • Floor Complete

  • Landscaping set to begin

  • Appliances were set

  • Interior Paint Complete

  • Plumbing finishes complete

12.06.25 Update

  • New kitchen design complete & framed

  • Appliance package ordered

  • Plumbing fixtures installation underway

  • Insulation & HVAC complete

11.22.25 Update

  • Plumbing fixture installation underway

  • Exterior facade demo complete / rock surface removed and window borders removed

  • Flooring removed

12.13.25 Update

  • Plumbing fixtures installation complete

  • Insulation & HVAC complete

01.10.26 Update

  • Master bath prepped for shower buildout

  • New kitchen design complete and framed

  • Appliance package ordered

  • Plumbing fixtures installation complete

  • Exterior facade demo complete/rock surface removed and window borders removed

  • Framing complete

  • Insulation & HVAC complete

01.03.26 Update

  • Master bath prepped for shower buildout

  • New kitchen design complete and framed

  • Appliance package ordered

  • Plumbing fixtures installation complete

  • Exterior facade demo complete/rock surface removed and window borders removed

  • Framing complete

  • Insulation & HVAC complete

02.14.26 Update

  • Primary bath prepped for shower buildout

  • New window installation underway

  • Appliance package ordered

  • Plumbing fixtures installation complete

  • Exterior facade demo complete/rock surface removed and window borders removed

01.17.26 Update

  • Primary bath prepped for shower buildout

  • New window installation underway

  • Appliance package ordered

  • Plumbing fixtures installation complete

  • Exterior facade demo complete/rock surface removed and window borders removed

  • Framing complete

  • Insulation & HVAC complete

01.31.26 Update

  • Primary bath prepped for shower buildout

  • All new windows installed

  • Appliance package ordered

  • Plumbing fixtures installation complete

  • Exterior facade demo complete/rock surface removed and window borders removed

04.03.26 Update

  • Color being applied to exterior

    Kitchen Cabinet installation complete

    New window installlation complete

    Electric Complete

    HVAC Complete

    Plumbiing Complete

    Interior Trim underway

03.07.26 Update

  • Primary bath prepped for shower buildout

  • New window installation underway

  • Appliance package ordered

  • Plumbing fixtures installation complete

  • Exterior facade demo complete/rock surface removed and window borders removed

03.20.26 Update

  • Stucco Complete

  • Exterior Paint to begin 

  • Kitchen Cabinet installation has started

  • New window installation complete

  • Electric Complete

  • HVAC Complete

  • Plumbing Complete

04.18.26 Update

  • Walls are primed and celings are painted

    Electrical trim 80% complete

    HVAC complete

    Flooring has been ordered

    Tile has started

    Cabinets are installed and counters have been templated

    All trim is complete

    Gutters have been measured

    Appliances are on site

    Plumbing fixtures are on site

    Upstairs railing has been measured for production

05.01.26 Update

  • Walls are primmed and ceilings are painted

  • Electrical trim 80% complete

  • HVAC has been running

  • LVP flooring has been ordered

  • Tile is complete

  • Cabinets are installed and the counters have been templated

  • All trim is complete

  • Stucco is complete with finish color

  • Gutters have been measured

  • Appliances are on site

  • Plumbing Fixtures are on site

  • Upstairs railing was measured for production

  • Last couple of doors were installed

  • Glass shower doors have been measured

  • Scheduled pressure washer to clean up gutters and roof

06.26.26 Update

  • New fascia and aluminum trim complete

  • New stairs and railings complete

  • Gutter and downspouts scheduled for

    next week

  • Pool scheduled

  • Glass for showers was ordered

  • Exterior stucco was patched

  • Counter choices were made and scheduled for fabrication

  • Interior vanities ordered

  • Floor Complete

  • Landscaping set to begin

  • Appliances were set

  • Interior Paint continuing

05.15.26 Update

  • New fascia and aluminum trim complete

    New stairs and railings underway

    Gutter and downspouts scheduled for next week

    Pool scheduled

    Glass for showers was measured

    Exterior stucco was patched

    Counter choices were made and scheduled for fabrication

    Interior vanities ordered

    Floor ordered and is in stock

    Landscaping starts next week